Saengrim Yard Manufacturing Facilities
NO
Description
Capacity
QT'Y
1
Edge Milling M/C
12M
1
2
Hydraulic CNC Press
15,000Ton/13M
1
3
Fit-up & Sealing M/C
12M
1
4
Inside Welding M/C
12M
2
5
Outside Welding M/C
12M
4
6
Calibration Press M/C
1,500Ton
2
7
End Facing M/C
12M
1
8
Pipe Gas Cutting M/C
12M
1
9
Hydrostatic Test M/C
250Kgf/§², 12M
1
10
Automatic TV Screen Type R/T M/C
325KV 45T
1
11
Prebender
Max 60T, 13 Meter
1
12
Back Milling M/C
Max 70T, 12.5 Meter
1
[ 1 ]